Building Progress: Electrical Second Fixing, Brome, Suffolk - 4th March 2014

It's time to "second fix" Nosher's electrical installation - sticking the sockets and switches on to the new wiring in the conservatory, office and garage, which together comprises some three-quarters of a kilometre of cable, 20 double plug sockets, three separate ring mains, seven lighting circuits and three new consumer units, with the consumer units connected together over 10mm armoured cable. And it all works first time.

next album: John and Caroline's Wedding, Sheene Mill, Melbourne, Cambridgeshire - 8th March 2014
previous album: A Trip to Orford Castle, Orford, Suffolk - 2nd March 2014

Hint: you can use the left and right cursor keys to navigate between albums, and between photos when in the photo viewer

Gov installs a new Consumer Unit

Gov installs a new Consumer Unit

Boomer works on sockets

Gov marks out some trunking

A neat stack of 20 Crabtree MCBs

Boomer watches as Gov tests sockets

More socket testing

Boomer checks on the wiring regulations

Harry, Fred and Amelia run around the room

More second-fixing and wiring over in the garage

Nosher's previous 1990s consumer unit

Meanwhile, the old roof is partly re-done

Andrew looks at the roof

Old insulation from 1995 is exposed

Lewis and Brian work on the old roof

Multiple roofing action

Millie - invisible cat - wakes up