Gov installs a new Consumer Unit
Building Progress: Electrical Second Fixing, Brome, Suffolk - 4th March 2014
It's time to "second fix" Nosher's electrical installation - sticking the sockets and switches on to the new wiring in the conservatory, office and garage, which together comprises some three-quarters of a kilometre of cable, 20 double plug sockets, three separate ring mains, seven lighting circuits and three new consumer units, with the consumer units connected together over 10mm armoured cable. And it all works first time.
next album: John and Caroline's Wedding, Sheene Mill, Melbourne, Cambridgeshire - 8th March 2014
previous album: A Trip to Orford Castle, Orford, Suffolk - 2nd March 2014
Boomer works on sockets
Gov marks out some trunking
A neat stack of 20 Crabtree MCBs
Boomer watches as Gov tests sockets
More socket testing
Boomer checks on the wiring regulations
Harry, Fred and Amelia run around the room
More second-fixing and wiring over in the garage
Nosher's previous 1990s consumer unit
Meanwhile, the old roof is partly re-done
Andrew looks at the roof
Old insulation from 1995 is exposed
Lewis and Brian work on the old roof
Multiple roofing action
Millie - invisible cat - wakes up
Hint: you can use the left and right cursor keys to navigate between albums, and between photos when in the photo viewer
Gov installs a new Consumer Unit
Boomer works on sockets
Gov marks out some trunking
A neat stack of 20 Crabtree MCBs
Boomer watches as Gov tests sockets
More socket testing
Boomer checks on the wiring regulations
Harry, Fred and Amelia run around the room
More second-fixing and wiring over in the garage
Nosher's previous 1990s consumer unit
Meanwhile, the old roof is partly re-done
Andrew looks at the roof
Old insulation from 1995 is exposed
Lewis and Brian work on the old roof
Multiple roofing action
Millie - invisible cat - wakes up