Bathroom Rebuilding, Brome, Suffolk - 1st February 2002

The Old Chap comes over to help as the old bathroom, which dates from 1958, is removed and replaced with a modern toilet and a glass-block shower cubicle. Then, there's a bit of a plumbing issue as it's discovered that a radiator pipe has been leaking for ages and has filled up the small void under the lounge floor.

next album: Marc Chops Trees, Richard Stallman and a March Miscellany, Suffolk and Cambridge - 5th March 2002
previous album: A 3G Lab New Year at Michelle's, St Ives, Cambridgeshire - 31st December 2001

Hint: you can use the left and right cursor keys to navigate between albums, and between photos when in the photo viewer

The old sink and bath have bene removed

The old sink and bath have bene removed

The 1950s toilet

The Old Man pokes around near the toilet

The old chap works over a hole in the floor

Tiles for a new shower cublicle go on the wall

The A14 is full of mid-lane tossers again

A total mid-lane tosser

Michelle's under Nosher's desk for some reason

A radiator has been secretly leaking

There's water up the wall

The floorboards have become very warped

The Sock and Sophie have a sleep

A glass-block wall is built for the shower

A new toilet and a near-finished shower

The Weber carburettor has been cleaned up